您好,歡迎訪問禹城泰瑞彩鋼復合板加工廠!

服務熱線

18765446878

熱門關鍵詞:禹城彩鋼廠,禹城彩鋼復合板,禹城鋼結構板房 彩鋼板房

禹城彩鋼廠:彩鋼板安裝要求和規范有哪些呢?

來源:http://m.cygpw.cn 日期:2024-09-21 發布人:

  一、場地核實??

  1、 Venue verification??

  在潔凈地面上初次處理之后,設備定位

  After initial treatment on a clean floor, equipment positioning02

  按設備定位、設計圖紙對隔墻放線定位

  Positioning of partition walls according to equipment positioning and design drawings

  確定現場尺寸是否與圖紙尺寸、

  Determine if the on-site dimensions match the dimensions on the drawing

  設備位置有相沖突的地方;

  There are conflicting locations of the equipment;

  ?

  ?

  對現場地面的水平進行核實

  Verify the level of the ground on site

  看波動是否較大

  Check if the fluctuations are significant

  是否有必要對彩鋼板墻體底部整體校平

  Is it necessary to level the bottom of the color steel plate wall as a whole

  二、安裝要求

  2、 Installation requirements

  (1)槽鋁固定固定槽鋁前必須先放線定位

  (1) Before fixing the slot aluminum, it is necessary to lay out the wire for positioning

  偏差不能超過5mm

  The deviation cannot exceed 5mm

  槽鋁用M5x30抽心鋁拉釘固定

  The groove aluminum is fixed with M5x30 center aluminum rivets

  間接不超過300mm有門洞位置須設置雙拉釘

  Double pull nails must be installed at doorways with an indirect distance not exceeding 300mm

  間隔不超過50mm

  Interval not exceeding 50mm

  (2)T型吊梁固定吊碼沿放線位置定位間距不超過1.20mT型梁與連接彩鋼板固定時

  (2) When fixing the T-beam with the hanging code along the laying out position, the positioning distance should not exceed 1.20m

  必須用角鋁或角鐵壓緊不得留有空隙壓固體必須在兩塊彩鋼板連接縫之上

  It must be compressed with angle aluminum or angle iron without leaving any gaps. The compressed solid must be above the joint between the two color steel plates

  (3)風口安裝天花上的風口安裝要按圖紙施工

  (3) The installation of air vents on the ceiling should be carried out according to the drawings

  避開T型梁

  Avoid T-beams

  墻體上的排、回風口安裝要離地200mm

  The installation of exhaust and return air vents on the wall should be 200mm above the ground

  (4)外觀要求整體安裝需平直美觀不得有碰撞刮劃痕跡要到才能撕保護膜板縫連接平實板縫間距3-4mm打膠要滿縫平直不得有縫隙

  (4) Appearance requirements: The overall installation should be straight and beautiful, without any collision or scratch marks. The protective film can only be torn off at the end. The board seam connection should be flat and solid, with a spacing of 3-4mm. Glue should be applied to the full seam, straight and without any gaps

  (5)螺絲固定每一塊頂板與圍護板之間的固定必須有3顆鉆尾螺絲圍護板、立板之間連接處上下各有一顆拉釘固定邊施工邊固定板縫必須垂直

  (5) Each screw fixing between the top plate and the enclosure plate must have 3 drilling tail screws. There must be one pull nail at the connection between the enclosure plate and the vertical plate, and one pull nail at the top and one at the bottom. The plate seam must be vertical while fixing during construction

  (6)門窗安裝

  (6) Installation of doors and windows

  門窗的安裝位置和開啟方向按圖紙要求而定單開門盡量在同一塊彩鋼板上雙開門的中心線盡量在板縫連接處以便切下的彩鋼板做門板門窗的型材連接需嚴密不能有縫隙整體門拐留置尺寸必須統一

  The installation position and opening direction of doors and windows should be in accordance with the requirements of the drawings. For order opening, the center line of the double door should be on the same color steel plate as much as possible, and the center line of the double door should be at the joint of the plate seam for easy cutting. The profile connection of the door panel and window should be tight and there should be no gaps. The overall door corner retention size must be uniform

  (7)內外圓弧固定與彩鋼板連接必須要嚴實外圓弧立柱不駁接內圓弧連接點之間不錯位縫隙嚴實/

  (7) The connection between the inner and outer arc fixation and the color steel plate must be tight. The outer arc column should not be connected, and there should be no misalignment or gaps between the inner arc connection points/

  本文由  禹城彩鋼廠 友情奉獻.更多有關的知識請點擊   http://m.cygpw.cn/   真誠的態度.為您提供為的服務.更多有關的知識我們將會陸續向大家奉獻.敬請期待.

  This article is a friendly contribution from Yucheng Color Steel Factory. For more related knowledge, please click http://m.cygpw.cn/ Sincere attitude. We provide you with comprehensive services. We will gradually contribute more relevant knowledge to everyone. Please stay tuned

聯系電話:18765446878

咨詢熱線:18765446878(微信同號)

地址:禹城市十里望鎮山東國際商貿港往南660米

備案號:魯ICP備2023024436號 魯公網安備37010202001695號 網站地圖|XML|TXT

微信二維碼

微信二維碼

主站蜘蛛池模板: 合肥抖音SEO网站优化-网站建设-网络推广营销公司-百度爱采购-安徽企匠科技 | 塑料异型材_PVC异型材_封边条生产厂家_PC灯罩_防撞扶手_医院扶手价格_东莞市怡美塑胶制品有限公司 | 塑料异型材_PVC异型材_封边条生产厂家_PC灯罩_防撞扶手_医院扶手价格_东莞市怡美塑胶制品有限公司 | 合肥注册公司|合肥代办营业执照、2024注册公司流程 | 热回收盐水机组-反应釜冷水机组-高低温冷水机组-北京蓝海神骏科技有限公司 | 除尘布袋_液体过滤袋_针刺毡滤料-杭州辉龙过滤技术有限公司 | 香港新时代国际美容美发化妆美甲培训学校-26年培训经验,值得信赖! | 临海涌泉蜜桔官网|涌泉蜜桔微商批发代理|涌泉蜜桔供应链|涌泉蜜桔一件代发 | 阻燃剂-氢氧化镁-氢氧化铝-沥青阻燃剂-合肥皖燃新材料 | 切铝机-数控切割机-型材切割机-铝型材切割机-【昆山邓氏精密机械有限公司】 | 高铝矾土熟料_细粉_骨料_消失模_铸造用铝矾土_铝酸钙粉—嵩峰厂家 | 篷房[仓储-婚庆-展览-活动]生产厂家-江苏正德装配式帐篷有限公司 | 广东风淋室_广东风淋室厂家_广东风淋室价格_广州开源_传递窗_FFU-广州开源净化科技有限公司 | 10吨无线拉力计-2吨拉力计价格-上海佳宜电子科技有限公司 | 翻斗式矿车|固定式矿车|曲轨侧卸式矿车|梭式矿车|矿车配件-山东卓力矿车生产厂家 | 合肥白癜风医院_合肥治疗白癜风医院_合肥看白癜风医院哪家好_合肥华研白癜风医院 | 膏剂灌装旋盖机-眼药水灌装生产线-西林瓶粉剂分装机-南通博琅机械科技 | 板式换网器_柱式换网器_自动换网器-郑州海科熔体泵有限公司 | 安徽净化工程设计_无尘净化车间工程_合肥净化实验室_安徽创世环境科技有限公司 | 医学动画公司-制作3d医学动画视频-医疗医学演示动画制作-医学三维动画制作公司 | 武汉天安盾电子设备有限公司 - 安盾安检,武汉安检门,武汉安检机,武汉金属探测器,武汉测温安检门,武汉X光行李安检机,武汉防爆罐,武汉车底安全检查,武汉液体探测仪,武汉安检防爆设备 | 清洁设备_洗地机/扫地机厂家_全自动洗地机_橙犀清洁设备官网 | 超声波成孔成槽质量检测仪-压浆机-桥梁预应力智能张拉设备-上海硕冠检测设备有限公司 | 台湾HIWIN上银直线模组|导轨滑块|TBI滚珠丝杆丝杠-深圳汉工 | 石油/泥浆/不锈钢防腐/砂泵/抽砂泵/砂砾泵/吸砂泵/压滤机泵 - 专业石油环保专用泵厂家 | 手持式浮游菌采样器-全排二级生物安全柜-浙江孚夏医疗科技有限公司 | 泰国专线_泰国物流专线_广州到泰国物流公司-泰廊曼国际 | 示波器高压差分探头-国产电流探头厂家-南京桑润斯电子科技有限公司 | 滚塑PE壳体-PE塑料浮球-警示PE浮筒-宁波君益塑业有限公司 | 定制防伪标签_防伪标签印刷_防伪标签厂家-510品保防伪网 | 浙江红酒库-冰雕库-气调库-茶叶库安装-医药疫苗冷库-食品物流恒温恒湿车间-杭州领顺实业有限公司 | B2B网站_B2B免费发布信息网站_B2B企业贸易平台 - 企资网 | 网站建设,北京网站建设,北京网站建设公司,网站系统开发,北京网站制作公司,响应式网站,做网站公司,海淀做网站,朝阳做网站,昌平做网站,建站公司 | 通信天线厂家_室分八木天线_对数周期天线_天线加工厂_林创天线源头厂家 | 环氧乙烷灭菌器_压力蒸汽灭菌器_低温等离子过氧化氢灭菌器 _低温蒸汽甲醛灭菌器_清洗工作站_医用干燥柜_灭菌耗材-环氧乙烷灭菌器_脉动真空压力蒸汽灭菌器_低温等离子灭菌设备_河南省三强医疗器械有限责任公司 | 阿里巴巴诚信通温州、台州、宁波、嘉兴授权渠道商-浙江联欣科技提供阿里会员办理 | 控显科技 - 工控一体机、工业显示器、工业平板电脑源头厂家 | 工装定制/做厂家/公司_工装订做/制价格/费用-北京圣达信工装 | China plate rolling machine manufacturer,cone rolling machine-Saint Fighter | 杭州画室_十大画室_白墙画室_杭州美术培训_国美附中培训_附中考前培训_升学率高的画室_美术中考集训美术高考集训基地 | 防火窗_耐火窗_防火门厂家_防火卷帘门-重庆三乐门业有限公司 |